In partnership with NHS
Upgrading HVAC systems for NHS hospitals and medical centres
hospitals, including the Princess Alexandra Hospital in Harlow and the Waltham Cross
Medical Centre.
All work was undertaken in live medical environments, including theatres and wards,
and demanded innovative working practices to ensure shutdowns were kept to a
minimum. A full plan was produced in revit ahead of any work to ensure clean
reconnections to existing gas and ventilation systems, and minimal disruption to the
medical staff and patients. The Waltham Cross medical centre contained a Covid Hub
that required a negative pressure system.
Key challenges:
- Live medical environment requiring fast, efficient turnarounds
- Work required during 2020 Covid-19 lockdown
Solutions:
- Full system planned in Revit to ensure it’s effectiveness ahead of going on-site
- Experienced team ensured that each upgrade was delivered quickly and
efficiently - ‘Key Worker’ status was granted allowing us to work on site within Covid-safe
guidelines
Products and Services Supplied: Air cooled chiller units and condensing units, BMS
system including new inverters, control valves and actuators, coils, door seals and fan
belts, cleaning services.
Project Info
Client: NHS Trusts
Value: £250,000 – £500,000
Our further expertise

Design and Planning

Installation and
Maintenance Support

Energy Management


Specialist Knowledge

Arcade UK Ltd
Arcade House
Kym Road, Bicton Industrial Park
Kimbolton, Cambridgeshire. PE28 0LW
T: 01480 861111
E: sales@arcade-uk.ltd.uk
Cookies may have been placed on your computer to make this website better.
Click here if you wish to change your cookie settings.
© All rights reserved: Arcade Ltd, Arcade UK Ltd, Arcade House, Kym Road, Bicton Industrial Park, Kimbolton, Cambridgeshire. PE28 0LW
Company Registration Number - 1199130
Some photos on this site have been used for visual purposes only and actual products and services may vary.
Arcade UK Ltd reserves the right to change the information on this site without prior notice.
Cookies may have been placed on your computer to make this website better. Click here if you wish to change your cookie settings. Accreditations that can be used in the footer
Designed by Keystone Marketing